PrepQuip PGM Plant Expansion
In Q1,2018 AZMET has been awarded a contract for the structural and civil design for the flotation expansion project under supervision of PrepQuip on a PGM plant. Minimal as build drawings were available to start the expansion design work. Without wasting time and effort AZMET utilised on site 3D scanning to obtain all as built general arrangement drawings, which reduced design time by 70%. Conventional methods would add at least 4 weeks upfront site measurement and drafting time to obtain the necessary as build layouts for a project of this size. The overall project design work was completed within 3 weeks, which include the onsite 3D scanning.