Tulkubash – 4t ADR Plant & Reagents In Q4, 2019 AZMET has been awarded an LSTK contract for the detail design & engineering of a 4 ton Carbon Batch, Gold Adsorption, Desorption and Recovery Plant (ADR Plant) for the CHAARAT Tulkubash Gold Heap Leach operation in Kyrgyzstan, with the following key features


Read more

Kyrgyzstan
Kyrgyzstan

PrepQuip PGM Plant ExpansionIn Q1, 2018 AZMET has been awarded a contract for the structural and civil design for the flotation expansion project under supervision of PrepQuip on a PGM plant.


Read more

Meli Gold Mine – 2t DR Plant & Reagent Systems In Q4, 2015 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a containerised, 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Meli Gold Mine in Ethiopia, incorporating the following processes:


Read more

Ethiopia
Ethiopia

Tongon – Quaternary Crusher Upgrade ProjectIn Q4, 2015 AZMET was awarded a contract for the Tongon operation, in the Ivory Coast, to implement a 4th Stage Crushing Circuit as part of an optimisation project to improve the overall plant capacity.


Read more

Ivory Coast
Ivory Coast

Tongon – LSTK Gold Room Scrubber SystemIn Q1, 2015 AZMET was awarded a LSTK contract for the Tongon operation, in the Ivory Coast


Read more

Ivory Coast
Ivory Coast

HASSAI – 2t DR Plant & Reagent SystemsIn Q4,2017 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Hassai Gold Mine operations in Sudan


Read more

Sudan
Sudan

In Q1,2017 AZMET has been awarded an EPCM contract for the design, supply and commissioning of a 4 ton Carbon Batch, Gold Adsorption, Desorption and Recovery Plant (ADR Plant) for the Lydian Amulsar gold heap leach operation in Armenia.


Read more

Armenia
Armenia

In Q4,2015 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a containerised, 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Meli Gold Mine in Ethiopia.


Read more

Ethiopia
Ethiopia

In Q1,2016 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a containerised, 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Eti Bakir operations In Turkey.


Read more

Turkey
Turkey
DFS Refractory Gold Project in Mozambique

AZMET was contracted for the engineering process design, for the completion of a Refractory Gold Project, Definitive Feasibility Study (DSF), located in Mozambique.

The Refractory Gold Project process flow consisted of two stage crushing and ball milling followed by an ultra-fine grind and afloatation circuit for concentration of the gold.

Flotation concentrate is oxidised through reactors and processed in a standard gold CIL circuit from where the loaded carbon is harvested and gold recovered through AZMET’s Modular Gold Desorption and Recovery Plant.

AZMET’s scope of work included but was not limited to all process design deliverables to DFS level of accuracy for the following process unit operations:

Carbon In Leach Circuit (CIL)

AZMET Desorption and Recovery Plant comprising of:

  • Loaded Carbon Handling including Carbon Attritioning & Transfer
  • Acid wash
  • Elution
  • Electrowinning
  • Goldroom including security
  • Regeneration
  • MCC & PLC

Reagent Packages

  • Lime
  • Cyanide
  • Caustic
  • Hydrochloric Acid
All