In Q4,2015 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a containerised, 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Meli Gold Mine in Ethiopia.


Read more

Ethiopia
Ethiopia

In Q1,2016 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a containerised, 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Eti Bakir operations In Turkey.


Read more

Turkey
Turkey

Projects

HASSAI – 2t DR Plant & Reagent Systems in Sudan

In Q4,2017 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Hassai Gold Mine operations In Sudan, incorporating the following processes:

  • Carbon Handling,
  • Acid wash,
  • Elution (SPLIT AARL)
  • Merrill Crowe Metal Precipitation
  • Goldroom & Security with Mercury Retort & Mercury Scrubber System
  • Carbon Regeneration
  • Carbon Fines Handling System
  • All related Reagent Make-up & Dosing Systems,
  • MCC & PLC.

Containerised Modules were ordered for supply and will be completed in 2018.

PrepQuip PGM Plant Expansion

In Q1,2018 AZMET has been awarded a contract for the structural and civil design for the flotation expansion project under supervision of PrepQuip on a PGM plant. Minimal as build drawings were available to start the expansion design work. Without wasting time and effort AZMET utilised on site 3D scanning to obtain all as built general arrangement drawings, which reduced design time by 70%. Conventional methods would add at least 4 weeks upfront site measurement and drafting time to obtain the necessary as build layouts for a project of this size. The overall project design work was completed within 3 weeks, which include the onsite 3D scanning.

Eti Bakir – Gold 2t DR Plant & Reagent Systems in Turkey

In Q1,2016 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a containerised, 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Eti Bakir operations In Turkey, incorporating the following processes:

  • Carbon Handling,
  • Acid wash,
  • Elution (Pressure Zadra)
  • Electrowinning with Ammonia & Mercury Scrubber Systems
  • Goldroom (brick building) & Security with Mercury Retort & Mercury Scrubber System
  • Carbon Regeneration with a Mercury Scrubber System
  • All related Reagent Make-up & Dosing Systems,
  • MCC & PLC.

In addition to the AZMET DR Plant, modular reagent make-up and dosing systems formed part of the supply contract, incorporating Cyanide, Caustic, Lime, Hydrochloric Acid and Detox (CuSO4 & SMBS).

Containerised Modules were ordered for supply and will be completed in 2018.

 

 

Meli Gold Mine – 2t DR Plant & Reagent Systems in Ethiopia

In Q4,2015 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a containerised, 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Meli Gold Mine in Ethiopia, incorporating the following processes:

  • Carbon Handling,
  • Acid wash,
  • Elution (Pressure Zadra)
  • Electrowinning,
  • Goldroom & Securty
  • All related Reagent Make-up & Dosing Systems,
  • MCC & PLC.

Containerised Modules were ordered for supply and completed in Q2, 2017.

Tongon – Quaternary Crusher Upgrade Project

In Q4, 2015 AZMET was awarded a contract for the Tongon operation, in the Ivory Coast, to implement a 4th Stage Crushing Circuit as part of an optimisation project to improve the overall plant capacity. The contract included procurement, fabrication, shipment, erection and commissioning. The circuit comprises of two dewatering screens, a fines transfer tank, a crusher feed bin and three quarternary cone crushers complete with their respective feed and discharge conveyors. Two new motor control centers (MCC’S) were also part of the upgrade project. Various modifications and tie-ins were required to retrofit the circuit in the existing crushing plant. AZMET started the erection Q4, 2015 and completed construction by end of Q1, 2016

Tongon – LSTK Goldroom Scrubber System

In Q1, 2015 AZMET was awarded a LSTK contract for the Tongon operation, in the Ivory Coast, to implement a Gold Room Scrubber System as part of an optimisation project to clean the fumes generated in the Gold Room. The LSTK contract included procurement, fabrication, shipment, erection and commissioning. The circuit comprises of a vertical scrubber unit complete with an extraction fan and circulating medium pump. The scrubber unit tied into the gold room via ducting.

Kibali – SMPP Desliming Cyclone Project

In Q1, 2015 AZMET was awarded a SMPP contract for the Kibali operation, in the DRC, to implement the Desliming Cyclone Circuit which was part of an optimisation project to improve the overall pumpcell plant recovery. The SMPP contract period ran over 26 weeks, which included procurement, fabrication, shipment, erection and commissioning. The circuit comprises of two sets of cyclone clusters complete with their respective feed, overflow and underflow systems.  Various modifications and tie-ins were required to retrofit the circuit in the existing gold processing plant. Approximately three (3) kilometres of HDPE piping were installed. AZMET started the erection in Q4, 2015 and handed over the circuit in the same quarter 2015.

Chirodzi – Float Plant Construction Management In Mozambique

In Q1, 2014 AZMET was awarded a 3 month contract for the Chirodzi Coal operation, in Mozambique, to assist construction management in implementing the Fine Coal Flotation Circuit, which was part of an optimisation project to improve the overall plant recovery. The circuit comprises of two stage flotation, a float tailings thickener, product filtration, reagent systems, MCC & PLC.  Various modifications and tie-ins were required to retrofit the circuit in the existing processing plant.