AZMET Basic Leach Technology (AZ-BLT)

AZMET has developed a cost-effective process route to recover copper from low grade secondary copper minerals utilising a basic leach process. The process can be used on existing tailings dumps and on the tails streams of operating flotation plants treating Supergene ores (secondary or cyanide soluble copper).

This process is based on proven process technologies that have been used in the industry and has been optimised to provide lower operating and capital cost requirements.

The benefit of this process will include but not be limited to:

  • A process circuit for the treatment of both copper and precious metals.
  • Simpler mine plan for complex ores (copper with gold and silver).
  • OPEX savings.
  • CAPEX savings.
All