Tulkubash – 4t ADR Plant & Reagents In Q4, 2019 AZMET has been awarded an LSTK contract for the detail design & engineering of a 4 ton Carbon Batch, Gold Adsorption, Desorption and Recovery Plant (ADR Plant) for the CHAARAT Tulkubash Gold Heap Leach operation in Kyrgyzstan, with the following key features


Read more

Kyrgyzstan
Kyrgyzstan

PrepQuip PGM Plant ExpansionIn Q1, 2018 AZMET has been awarded a contract for the structural and civil design for the flotation expansion project under supervision of PrepQuip on a PGM plant.


Read more

Meli Gold Mine – 2t DR Plant & Reagent Systems In Q4, 2015 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a containerised, 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Meli Gold Mine in Ethiopia, incorporating the following processes:


Read more

Ethiopia
Ethiopia

Tongon – Quaternary Crusher Upgrade ProjectIn Q4, 2015 AZMET was awarded a contract for the Tongon operation, in the Ivory Coast, to implement a 4th Stage Crushing Circuit as part of an optimisation project to improve the overall plant capacity.


Read more

Ivory Coast
Ivory Coast

Tongon – LSTK Gold Room Scrubber SystemIn Q1, 2015 AZMET was awarded a LSTK contract for the Tongon operation, in the Ivory Coast


Read more

Ivory Coast
Ivory Coast

HASSAI – 2t DR Plant & Reagent SystemsIn Q4,2017 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Hassai Gold Mine operations in Sudan


Read more

Sudan
Sudan

In Q1,2017 AZMET has been awarded an EPCM contract for the design, supply and commissioning of a 4 ton Carbon Batch, Gold Adsorption, Desorption and Recovery Plant (ADR Plant) for the Lydian Amulsar gold heap leach operation in Armenia.


Read more

Armenia
Armenia

In Q4,2015 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a containerised, 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Meli Gold Mine in Ethiopia.


Read more

Ethiopia
Ethiopia

In Q1,2016 AZMET has been awarded a LSTK contract for the design, supply and commissioning of a containerised, 2 ton Carbon Batch, Gold Desorption and Recovery Plant (DR Plant) for the Eti Bakir operations In Turkey.


Read more

Turkey
Turkey
AZ-CRP: AZMET Cyanide Removal Process

AZMET Technology & Projects has developed a unique, patented process known as AZMET CYANIDE REMOVAL PROCESS (AZ-CRP), which uses well known activated carbon technology to extract free cyanide radicals, as well as metal cyanide complexes from gold tailings.

OPEX and Environmental constraints related to Cyanide are two major issues facing the Gold Industry today. The AZ-CRP will decrease pressure on both constraints.

The AZ-CRP is especially well suited for the extraction of copper cyanide from both solution or pulp streams. The AZ-CRP can produce partial recycled cyanide at a fraction of the price of new cyanide. When the cost of cyanide destruction is included, which is mandatory by the ICMI, the cost reduction of buying and destroying cyanide in the tails stream, becomes extremely attractive in the current competitive gold market.

In addition, the AZ-CRP technology provides the benefit of secondary extraction of gold (Au) and other precious metals to ensure maximum yield within the client’s process operation.

The AZ-CRP include the following special features:

  • Additional recovery of gold (Au) and other precious metals in the leach tails.
  • Recovery of valuable base metal by-products in the eluate.
  • Removal of cyanide in final tails for partial reuse in the leach circuit.
  • Cyanide tailings discharge will be within the limits as prescribed by the International Cyanide Code (ICMI).
  • Use proven gold processing technologies.
  • Use reagents currently used on gold processing facilities.
  • Leach tails do not require additional cyanide destruction after the AZ-CRP.
  • Elute cyanide and base metals under “ambient” conditions.

Where do you start?
Implementation of the AZ-CRP, at an existing gold operation, will start with onsite cyanide removal testwork to establish the optimal process conditions. The testwork will be followed by a high-level financial (CAPEX and OPEX) evaluation to indicate the financial impact of the AZ-CRP on the operation with the NPV, IRR and payback period as deliverables. Further pilot plant tests would normally be recommended after the lab scale tests to improve the confidence level and define the full-scale design criteria. The pilot plant will treat a 1 tph (solids) bleed stream from the as arising tails through the AZ-CRP containerized plant. After finalisation of the pilot testwork and feasibility study, the design and implementation of the full AZ-CRP plant will follow.

Numerous site trials have been conducted over the last 18 months with exceptional results. AZMET will be running the first pilot plant in the coming months with the implementation of the full scale AZ-CRP to follow immediately thereafter. This process will then be repeated at the other mines were the onsite lab scale testwork have been completed.

For more information please refer to the AZ-CRP technology brochure.

All